BEASTII a.k.a. SuperBeast

aligator.jpg

Long Term Deadlines

  • QCS will be ready when the machine is ready (Oct 2014)
  • Beast II will run with QCS in from October 2014 until March 2015
  • Belle II will start running in Dec 2015, one long run until summer 2016 shutdown.

Imminent Deadlines

  • Nov 11,12 2011: BPAC ( http://kds.kek.jp/conferenceDisplay.py?confId=7602 ) ---> first concept drawing ???
  • Nov 18 2011: Poster for Ground Breaking Ceremony @ KEK --> first concept drawing? Needed several days earlier.. Nov 11?
  • Nov 16 2011: Talk, November B2GM @ KEK --> first concept drawing?
  • Dec 15 2011: Talk at Director's review @ PNNL --> improved concept drawing

US Belle-2 Project Documents

Belle2 Beam Background Studies

From Nakayama San:

BEAST I Documentation

Material From Hawaii Weekly BEASTII Meetings

  • Marc Rosen's first concept drawing:
    beast2-conceptual_110911.jpg

  • two drift chamber prototypes:
    drift_chamber_prototypes.JPG

Recent Talks given at other meetings

-- SvenVahsen - 27 Oct 2011
I Attachment Action SizeSorted ascending Date Who Comment
Touschek.pdfpdf Touschek.pdf manage 1 MB 27 Oct 2011 - 07:58 SvenVahsen simulation of KLM backgrounds
drift_chamber_prototypes.JPGJPG drift_chamber_prototypes.JPG manage 2 MB 10 Nov 2011 - 07:02 SvenVahsen two drift chamber prototypes
RotateAndBeast.pptppt RotateAndBeast.ppt manage 3 MB 27 Oct 2011 - 18:53 SvenVahsen Ushiroda at KEK Monday Meeting
BEAST_idm_vahsen_nb.pptxpptx BEAST_idm_vahsen_nb.pptx manage 5 MB 27 Oct 2011 - 06:57 SvenVahsen Sep 1 2011, Vahsen at Inter Detector Meeting (IDM)
aligator.jpgjpg aligator.jpg manage 48 K 27 Oct 2011 - 06:39 SvenVahsen a beast
10_27_2011_beast_vahsen.pdfpdf 10_27_2011_beast_vahsen.pdf manage 142 K 09 Nov 2011 - 08:27 SvenVahsen vahsen at 10/27/11 meeting
cleorad.pdfpdf cleorad.pdf manage 229 K 10 Nov 2011 - 06:49 SvenVahsen Cinabro talk on CLEO diodes
Beast_Quarterly_Report-Vahsen-09-2011.pdfpdf Beast_Quarterly_Report-Vahsen-09-2011.pdf manage 447 K 27 Oct 2011 - 07:22 SvenVahsen first quaterly report to PNNL/DOE
beast2-conceptual_110911.jpgjpg beast2-conceptual_110911.jpg manage 688 K 10 Nov 2011 - 06:50 SvenVahsen Marc Rosen's first concept drawing
first_beast_meeting_final.pdfpdf first_beast_meeting_final.pdf manage 1006 K 27 Oct 2011 - 07:15 SvenVahsen vahsen slides @ inaugural hawaii beastII meeting
Topic revision: r4 - 10 Nov 2011, SvenVahsen
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Foswiki? Send feedback